Process
ORDERING PROCESS
Give us a ring at 928-433-2030 or email info@campovrlnd.com and pick our brain on options and estimates.
Please pay the appropriate deposit based on truck size on the camper options page.
Once you have paid your deposit we will send you a deposit contract which will outline what further information is needed.
Your deposit is applied to your final invoice. An additional $4000 of your final invoice is due 3 months prior to your build and the rest is due 2 weeks before we finish the build. We will send invoice with the amounts as reminders!
ESTIMATE PROCESS
Send us your list of add-ons and we'll get you an estimate. If the estimate looks good, you'll need to sign it and return it. This tells us that everything looks good and we're ready to build!
DESIGN PROCESS
Some trucks that we don't build often for will require some extra design work. This makes sure we're on the same page. If you want added bedding room, or higher side walls, a final drawing will reflect this. The drawing is then sent to you requiring a signature for approval.
BUILD PROCESS
Once we have everything together we'll start to build the frame and start adding all the stuff you wanted. This takes about 3-4 weeks from start to finish. Once we start, we'll be in touch to figure out an install date that works.
INSTALL PROCESS
Install usually takes an hour or two. We give you a run through of your new camper cabin and can tell you where to immediately setup camp around Flagstaff, Sedona or the Grand Canyon.
LET THE GOOD TIMES ROLL!!!